Avignon Tramway
Project
NGE subsidiary companies were responsible for several contract work packages of the Avignon Tramway project, including ‘system and tracks’, ‘overhead contact and power lines’ and ‘worksite area clearance’.
It is expected to enter service in October 2019
The key figures
of the project
10,4 km
of single track
of single track
2
lines
lines
16
stations
stations
Challenges
For the first time in France, the teams have installed prefabricated concrete track modules called ladder track; a process that demanded flexibility from all Group contributors to this project. Installing the track in this way was possible only thanks to the latitude of operational opportunities provided by the multi-expertise model.
The main stages
of the project
Start of works
Line infrastructure
Start of tests
Entry into service