Replacement of 2,450 metres of pipelines at Argenteuil

Project
Location
Argenteuil – France
Type
Pipeline replacement
Subsidiary
EHTP

The object is to remove one of the two pipelines, and demolish and remove its supporting structures. Four service shafts are needed to provide tunnel access. Cranes are located above 3 of them to handle the pipeline sections and components.

The key figures
of the project

2,450 metres
of pipeline to be replaced