Repairs to the Gennevilliers Viaduct
                        Project
                    
                    - Location
- Argenteuil (95) – France
- Type
- Structural repairs
- Subsidiary
- NGE FONDATIONS
When a section of walling supporting the roadway of the Gennevilliers viaduct collapsed, NGE Fondations was awarded the contract to carry out the repairs on the basis of its innovative AD/OC® (Self-Draining/Carbon Optimised) soil nail walling technique. Using this technique saves a considerable amount of time, because the prefabricated concrete slabs rest on top of each other, eliminating the need for the preliminary formwork phase.
            The key figures
                
 of the project            
            
                        200 000
drivers use this road every day
                                    drivers use this road every day
                        100
% of the road surface is drained
                                    % of the road surface is drained
                        6
months: fully reopened to traffic
                            months: fully reopened to traffic
                Explore also
            
            
         
                 
                 
                 
                
                 
         
                 
                