Previous Next

Strengthening of the Digue des Alliés

Project
Location
Dunkerque, Nord region of France
Type
Strengthening
Subsidiary
NGE FONDATIONS

NGE FONDATIONS has once again demonstrated its technical expertise in difficult conditions with the repair and reinforcement of the Digue des Alliés sea defences on the Tixier Canal outlet embankment; a major flood protection defence for the town.

The key figures
of the project

1 km
of flood protection dyke
8 700 m²
of sheet piling along the full length
3 100 m²
of demolition and reconstruction of the dyke's concrete capping
Challenges

ChalleNGE : To carry out the work from the tidal waterway.