Soil nailed wall – Séchilienne bypass
Project
- Location
- Séchilienne - Isère region of France
- Type
- Strengthening
- Subsidiary
- GUINTOLI
- NGE GC
- NGE FONDATIONS
To increase safety on the RD 1091 road where it crosses through a very active landslide zone between Vizille and Séchilienne, NGE provided its expertise in the form of earthworks, strengthening works, blasting and civil engineering to create a soil nailed wall more than 47 metres high. The 18,000 m2 wall is reinforced with 100 AD/OC walling slabs (300 m2).
The key figures
of the project
47
m high
m high
5
berms
berms
100
AD/OC slabs
AD/OC slabs