Embankment safety engineering and retention works near Sèvres Ville d’Avray station
Project
- Location
- Sèvres Ville d'Avray - France
- Type
- Safety engineering and retention works
- Subsidiary
- GUINTOLI
- NGE FONDATIONS
- TSO
- FVF
- LAGARRIGUE
- MIRE
- OFFROY
In early February 2020, traffic was halted on lines L and U of the Paris Region’s Transilien suburban rail network following the collapse of a railway embankment near Sèvres-Ville d’Avray station.
This was the first project in France to resume work after the pandemic lockdown was announced on 25 March, thanks to the commitment and determination of NGE FONDATIONS, TSO, OFFROY, FVF, MIRE, GUINTOLI and LAGARRIGUE teams.
Resumption of work on this ‘emergency project’ enabled these essential public service transport routes to reopen. These rail links to the west of Paris carry very large numbers of passengers under normal circumstances.
Trains between Saint-Cloud and Versailles Rive Droite began the process of resuming normal services on 4 May.
The key figures
of the project
500 m2
of retention walling
of retention walling
2 km
of anchored retention works
of anchored retention works