Construction of the Austreberthe Viaduct
Project
- Location
- The Austreberthe valley
- Type
- Engineered structure
NGE was involved in the construction of a viaduct in the Austreberthe valley, creating an 18-km motorway link between Barentin and Ecalles-Alix to effectively extend the A150 and connect it with the A29. The structure comprises 5 reinforced concrete pillars and a metal structure with a reinforced concrete slab deck.
The key figures
of the project
18 km
km of dual carriageway
km of dual carriageway
11
communities crossed
communities crossed
2 500 000
tonnes of spoil
tonnes of spoil