Previous Next

Sealing the Curbans canal

Project
Location
Hautes-Alpes – France
Type
Engineered structure

NGE has carried out the project to upgrade the canal that supplies the Curbans hydroelectric plant by coating it with sealant to ensure zero water loss.

The key figures
of the project

250 km
long
1 machine
specially designed and produced for this project
Challenges

ChalleNGE : To apply the coating, NGE designed a machine unique in France: a 20-metre long ‘beam’.