Strengthening of the Digue des Alliés
Project
NGE FONDATIONS has once again demonstrated its technical expertise in difficult conditions with the repair and reinforcement of the Digue des Alliés sea defences on the Tixier Canal outlet embankment; a major flood protection defence for the town.
The key figures
of the project
1 km
of flood protection dyke
of flood protection dyke
8 700 m²
of sheet piling along the full length
of sheet piling along the full length
3 100 m²
of demolition and reconstruction of the dyke's concrete capping
of demolition and reconstruction of the dyke's concrete capping
Challenges
ChalleNGE : To carry out the work from the tidal waterway.