The A10/A71 motorway split
Project
Carried out under the terms of the contract awarded by Vinci Autoroutes / COFIROUTE, this project is designed to reconfigure the A10/A71 junction to improve and smooth motorway traffic flows around Orléans, and therefore improve road safety.
The project is technically and organisationally very complex, and includes:
- the creation of a 4th lane for the A10 between the A10/A71 split and the A10/A19 split
- the construction of temporary carriageways to maintain two lanes of traffic in each direction
- the creation of a new special structure over the A10, and modifications to existing bridges
- the creation of the reinforced earth and embankments made necessary by the constricted footprint available
The key figures
of the project
4th
lane construction
lane construction
310 tonnes
of structural metalwork
of structural metalwork
Explore also